Site Preprepation - rp7400

20
laying tiles).
Use conductive wax if waxed floors are necessary.
Ensure that all equipment and flooring are properly grounded and
are at the same ground potential.
Use conductive tables and chairs.
Use a grounded wrist strap (or other grounding method) when
handling circuit boards.
Store spare electronic modules in antistatic containers.