HP B-series 16Gb FC Switches Hardware Reference Guide

5. Install the switch. See Figure 21 (page 34).
a. From the front of the rack, slide the switch (with inner rails attached) onto the outer rails,
taking care to align the inner rails with the attachment screws on the outer rails at the
rear of the rack.
b. When the switch is in place, secure the inner rails to the outer rails by tightening the
screws at the rear of the rack.
Figure 21 Installing the switch in the rack
6. At the front of the rack, run the switch power cords from the sides of the rack through the
cutouts in the rail, and then connect them to the switch power supplies. Connect two power
cords to the SN6000B 48-port switch. Connect one power cord to the SN3000B 24-port
switch. See Figure 22 (page 35).
IMPORTANT: Make sure that the power cords do not come in contact with any sharp edges.
NOTE: For switches with Port Side Air Intake, the power connections are at the rear of the
rack.
If you are configuring the second (optional) power supply, the SN3000B 24-port switch will
also have two power cords.
34 Installing and configuring HP 16Gb FC switches