HP Director Blade Installation Instructions Overview Use these installation instructions if you have purchased one of the optional director blades listed in Table 1 (page 1). Install the blades in compatible director models only. NOTE: This document refers to blades by their short names. Table 1 Director blades Model © Copyright 2011–2014 Hewlett-Packard Development Company, L.P.
Table 1 Director blades (continued) Table 1 Director blades (continued) Model HP DC SAN Director Switch 10/24 FCoE blade option HP DC SAN Director 64-port 8Gb Fibre Channel Blade Short name (imprinted Part Compatible HP director on blade) number models FC8-64 nl nl FCOE10-24 AP866A DC SAN Backbone AP866B Director, DC04 SAN Director AP866C nl BK798A DC SAN Backbone BK798B Director, DC04 SAN Director, BK798C SN8000B 8-Slot SAN Backbone Director, SN8000B 4-Slot SAN Director nl nl nl nl HP DC SAN F
CR16-4 Components CR16-8 Components Figure 1 CR16-4 Figure 2 CR16-8 1. Power LED 2. Status LED 1. Power LED 3. QSFP port map and trunking 4. QSFP Connectors diagram 2. Status LED 3. QSFP port map and trunking 4. QSFP Connectors 8—15 diagram 5.
FC8-32E components FC8-48E components Figure 3 FC8-32E Figure 4 FC8-48E 1. Power LED 2. Status LED 1. Power LED 2. Status LED 3. FC ports 24–31 4. Port and trunking group map 3. FC ports 24–47 4. FC ports 0–23 5. FC ports 16–23 6. FC ports 0–7 7.
FC16-32 components FC16-48 components Figure 5 FC16-32 Figure 6 FC16-48 1. Power LED 2. FC ports 8–15 3. FC ports 0–7 4. Port status LED 5. FC ports 24–31 6. Port and trunking group map 7. FC ports 16–23 Page 5 1. Power LED 2. FC ports 0–23 3. Status LED 4.
FCOE10-24 components FX8-24 components Figure 7 FCOE10-24 Figure 8 FX8-24 and FX8-24E 1. Power LED 2. 10-GbE FCoE ports 0–11 1. Power LED 2. 1 GbE ports 0–3 3. Status LED 4. 10-GbE FCoE ports 12–23 3. 10-GbE ports 0–1 4. FC ports 0–5 5. Status LED 6. 1 GbE ports 4–9 7.
FS8-18 components Figure 9 FS8-18 1. Power LED 2. Status LED 3. FC port 4. Port status LED 5.
FC4-16 components FC4-32 components Figure 10 FC4-16 Figure 11 FC4-32 1. Power LED 2. Status LED 1. Power LED 2. Status LED 3. FC Port 4. Port speed LED 3. FC Port 4. Port speed LED (left port) 5. Port status LED 6. FC ports 0–15 5. Port status LED (left port) 6. Port speed LED (right port) 7. Port status LED (right port) 8. FC ports 16–31 9.
FC4-48 components FC8-16 components Figure 12 FC4-48 Figure 13 FC8-16 1. Power LED 2. Status LED 3. FC Port 4. Port status LED 5. FC ports 0–15 1. Power LED 2. Status LED 3. FC Port 4. Port status LED 5. FC ports 24–47 6.
FC8-32 components FC8-48 components Figure 14 FC8-32 Figure 15 FC8-48 1. Power LED 2. Status LED 1. Power LED 2. Status LED 3. FC Port 4. Port status LED 3. FC Port 4. Port status LED 5. FC ports 16–31 6. FC ports 0–15 5. FC ports 24–47 6.
FC8-64 components FC10-6 components Figure 16 FC8-64 Figure 17 FC10-6 1. Status LED 2. Power LED 3. FC Port 4. Port status LED 5. FC Port 6. FC Port 7. FC ports 32–63 8. FC ports 0–31 NOTE: only. 1. Power LED 2. Status LED 3. FC port 4. Port status LED 5.
FC4-16IP components FR4-18i components Figure 18 FC4-16IP Figure 19 FR4-18i blade 1. Power LED 2. Status LED 3. FC Port 4. Port status LED 5. GbE ports 0–1 6. FC ports 0–15 Verifying installation requirements 1. Power LED 2. Status LED The installation takes less than 10 minutes. You will need the following items: 3. FC Port 4. Port status LED • Replacement director blade 5. FC ports 0–7 6.
• Extended form-factor pluggable (XFP) transceivers, as needed, for the FC10-6 only • Optical cables, as needed Figure 20 Removing filler panels Transceiver support • The FC8-64 supports mSFPs only, and is shipped with them installed. • Except for the FC8-64, all 8 Gb and 16 Gb blades use B-series SFPs. • CR16-8 and CR16-4 use QSFP transceivers for ICL connections. • The SFP-integrated FC16-32 and FC16-48 blades are shipped with the SFPs installed.
FC16-48 FC8-64 FCOE10-24 FC4-48 FC8-16 FS8-18 FC8-32 FX8-24 FX8–24E CR16–4 a. CR16–8 Open the ejectors approximately 45 degrees, align the flat side of the blade inside the upper and lower rail guides in the slot, and then, while applying slight pressure to the left, slide the blade into the slot (Figure 21 (page 14)).
5. For blades with ejectors: a. Open the ejectors. b. Align the flat side of the blade inside the upper and lower rail guides in the slot. c. Slide the blade into the slot until it is firmly seated (Figure 22 (page 15)). d. Close the ejectors.