Cisco Nexus 5000 Series Switch Fabric Manager Software Configuration Guide, NX-OS 4.0 (OL-16598-01, June 2008)

Send comments to nx5000-docfeedback@cisco.com
7-16
Nexus 5000 Series Switch Fabric Manager Software Configuration Guide
OL-16598-01
Chapter 7 Using Cisco Fabric Services
CFS Example Using Fabric Manager
Figure 7-10 CFS Configuration
Step 3
Choose enable for each switch from the Feature Admin drop-down list.
Step 4 Repeat step 3 for all switches in the network.
Note A warning displays if you do not enable CFS for all switches in the network for this feature.
Step 5 Check the Master check box for the switch to act as the merge master for this feature.
Step 6 Choose commit Changes from the Config Action drop-down list for each switch that you enabled for
CFS.
Step 7 Click the Servers tab in the Information pane.
You see the configuration for this feature based on the master switch (see Figure 7-11).
Step 8 Modify the feature configuration. For example, right-click the name in the Master column and choose
Create Row to create a server for NTP.
a. Enter the ID and the Name or IP Address of the NTP server.
b. Set the Mode radio button and optionally check the Preferred check box.
c. Click Create to add the server.
Figure 7-11 Servers Tab
Step 9
Click the Delete Row icon to delete a row.
If you make any changes, the status automatically changes to Pending (see Figure 7-12).
Figure 7-12 Status Change to Pending