Cisco MDS 9200 Series Hardware Installation Guide (OL-16188-01, April 2008)

Contents
v
Cisco MDS 9200 Series Hardware Installation Guide
OL-16188-01
Grounding the Chassis 2-24
Starting Up the Switch 2-26
Removing and Installing Components 2-28
Removing and Installing Switching and Services Modules 2-28
Removing a Caching Services Module 2-31
Removing Other Switching or Services Modules 2-32
Installing a Switching or Services Module, Including Caching Services Modules 2-33
Verifying Installation of a Switching or Services Module 2-34
Maintaining a Caching Services Module 2-35
Maintaining the Batteries on the Caching Services Module 2-35
Maintaining the Disk Drives on the Caching Services Module 2-35
Removing and Installing Power Supplies 2-36
Removing a Power Supply 2-36
Installing a Power Supply 2-36
Removing and Installing the Fan Module 2-38
Removing a Fan Module 2-39
Installing a Fan Module 2-39
Removing the Cisco MDS 9200 Series 2-40
CHAPTER
3 Connecting the Cisco MDS 9200 Series 3-1
Preparing for Network Connections 3-2
Connecting to the Console Port 3-2
Connecting to the COM1 Port 3-4
Connecting to the MGMT 10/100 Ethernet Port 3-5
Connecting to a Fibre Channel Port 3-6
Removing and Installing X2 Transceivers 3-6
Installing an X2 Transceiver 3-8
Removing an X2 Transceiver 3-8
Removing and Installing SFP Transceivers 3-8
Installing an SFP Transceiver 3-9
Removing an SFP Transceiver 3-10
Removing and Installing Cables into SFP Transceivers 3-11
Installing a Cable into an SFP Transceiver 3-11
Removing a Cable from an SFP Transceiver 3-12
Maintaining SFP Transceivers and Fiber-Optic Cables 3-13
APPENDIX
A Cabinet and Rack Installation A-1
Cabinet and Rack Requirements A-1
General Requirements for Cabinets and Racks A-1