director 2/64 installation guide
2–2 director 2/64 installation guide
Installing and Configuring the Director 2/64
• Verify that there is space in the rack. The director is 9U (15.75 in) high. In
addition, 1U is required in the HP rack system/e and industry-standard 19-in racks
for the rail tray kit. Note that the tray provides 1U of space for cable management.
• Verify that the rack is stable.
• If applicable, obtain the necessary remote workstations or Simple Network
Management Protocol (SNMP) workstations. Workstations are customer-supplied
and connected through a corporate or dedicated LAN.
• Verify that all other equipment installed in the rack is connected to a reliable
ground connection; do not rely on connections to a branch circuit, such as a power
strip.
• Hewlett-Packard recommends securing the rack mechanically to prevent it from
tipping over during a natural disaster, such as an earthquake.
Items Required for Installation
Locate the following items before beginning the installation procedure:
• Lift device (recommended)
NOTE: Hewlett-Packard recommends using the LIFT-O-FLEX 17000 SP 400 from R on I.
For more information, visit the R on I Web site at http://www.roni.com/.
•Director 2/64
• An HP 9000, HP 10000, HP 11000, HP M-Series, HP rack system/e, or
industry-standard 19-in rack, or any rack with the following specifications:
— A minimum depth of 24.5 in
— 19 in wide
— A minimum opening size of 10U available (9U for the director and 1U for the
rail tray kit).
• Two power outlets or different branches (for redundancy)
• Torque driver with cross-tip bit (for setting 22 in/lb. of torque)
• Fiber-optic protective plug—For safety and port transceiver protection, fiber-optic
protective plugs must be inserted in all director ports without fiber-optic cables
attached. The director is shipped with protective plugs installed in all ports.