director 2/64 installation guide
director 2/64 installation guide 2–13
Installing and Configuring the Director 2/64
Insert the Cage Nuts
Read the following sections for instructions on inserting front and rear cage nuts in the
rack.
Insert the Front Cage Nuts in the Rack
Use these steps to insert the six supplied cage nuts in the rack’s front rails:
1. Select one of the front rails.
2. Count up 11 square openings from the top screw of the shelf bracket, and insert
the first of three cage nuts.
3. Count up 5 square openings from the cage nut you just installed, and insert the
next cage nut.
4. Count up four square openings and install the third cage nut.
5. Repeat this procedure to install cage nuts in the corresponding front rail.
Insert the Rear Cage Nuts in the Rack
Use these steps to insert the four supplied cage nuts in the rack’s rear rails:
1. Select one of the rear rails.
2. Count up six square openings from the top screw of the rear shelf bracket. Insert
the first of two cage nuts.
3. Count up sixteen square openings from the cage nut you just installed, and insert
the next cage nut.
4. Repeat this procedure to install cage nuts in the corresponding rear rail.
Finalize the Rack Mounting Procedure
Use the following sections to complete the installation procedure.
After completing the steps outlined in the previous sections, prepare to orient the
switch in the rack, as follows.
WARNING: The Director 2/64 weighs approximately 115 pounds. Use proper
handling and lifting equipment to reduce the possibility of injury or product
damage.