director 2/64 installation guide
2–16 director 2/64 installation guide
Installing and Configuring the Director 2/64
WARNING: Hewlett-Packard power cords are provided for each director power
supply. To prevent personal injury by electric shock, use only the supplied
power cords. Also, verify that the facility power receptacle is the correct type,
supplies the required voltage, and is properly grounded.
9. Connect the equipment rack power cords to separate (for redundancy) facility
power sources, providing single-phase, 120 to 240 VAC current.
Figure 2–7: AC power connections
HP Rack System/e and Industry-Standard 19-in Rack
Installation
To install the director in an HP rack system/e or industry-standard 19-in rack,
complete the procedures in the following sections:
• Install the Anti-tip Feet on an HP Rack System/e Rack, page 2–17
• Install Mounting Bracket Hardware in the Rack, page 2–17
• Prepare the Front and Rear Rack Columns, page 2–20
• Prepare the Switch for Installation, page 2–22
• Finalize the Rack Mounting Procedure, page 2–23
• Sliding Shelf Installation—For an HAFM Server only, page 2–26
• Recommended Cable Management, page 2–29