director 2/64 installation guide

director 2/64 installation guide 2–25
Installing and Configuring the Director 2/64
b. Insert the screws (6) through the rear mounting bracket slots into the threaded
nuts of the angle bracket.
c. Insert a second set of screws (4) through the angle bracket and the rail
column into the sheet metal nuts on the back rail (3).
d. Repeat step a through step c for the other side at the back of the switch.
e. At the front of the rack, insert the screws through the front mounting brackets
into the sheet metal nuts installed in the rail columns in step 1 of “Prepare the
Front and Rear Rack Columns” on page 2–20.
f. Tighten all screws.
Figure 2–17: Securing the switch to the rack
3. Connect the other ends of the PDU power cords to separate PDUs (if installed);
otherwise, connect the two standard AC power cords.
NOTE: Hewlett-Packard recommends installing an optional PDU in the rack.
Hewlett-Packard ships two PDU power cords with the Director 2/64.