WARNING: Hewlett-Packard power cords are provided for each director power
supply. To prevent personal injury by electric shock, use only the supplied
power cords. Also, verify that the facility power receptacle is the correct type,
supplies the required voltage, and is properly grounded.
4. Connect the equipment rack power cords to separate (for redundancy) facility
power sources, providing single-phase, 120 to 240 VAC current.
Sliding Shelf Installation—For an HAFM Server only
This section only applies to a Management Station. Use the following procedure to
install sliding shelf brackets, as shown in Figure 2–18:
1. Select a U slot above the switch. (It is recommended to select the U slot
immediately above the switch. However, other U slots above the switch may also
be used.)
2. On each rack rear column, locate the hole (1) that is 2 holes up from the EIA
number of the selected U slot (3).
3. Line up this hole with the threaded hole on the sliding shelf bracket's side.
4. Using a screw (2), attach bracket (5) to the rack.
5. Attach another screw (4) loosely in the hole on the inside face of the mounting
bracket (5).