director 2/64 installation guide

2–28 director 2/64 installation guide
Installing and Configuring the Director 2/64
Figure 2–19: Positioning the sliding shelf bracket on a rail rear slot
7. Make sure that the sliding shelf and rails are horizontal, as shown in Figure 2–20
at the rack front.
8. Push each of the rail front tabs (1) into the corresponding holes on the rack
columns (2).
9. At the back of the rack, tighten the screws that attach the sliding shelf rails to the
mounting brackets, as shown in Figure 2–19 (2).