director 2/64 installation guide

director 2/64 installation guide 2–29
Installing and Configuring the Director 2/64
Figure 2–20: Positioning the sliding shelf bracket at the rack front
Recommended Cable Management
Perform the following procedure after installing a switch, as shown in Figure 2–21:
1. Install two cable restraints (1) on each side of the rack in positions that will hold
the Fibre Channel cables away from the power supply.
2. Form loose bundles of the installed Fibre Channel cables (2) on each side of the
rack.
3. Wrap the cable bundles with the cable restraints (1) in two positions on each side
of the rack to maintain clearance for power supply access (3).