director 2/64 service manual

2–102 director 2/64 service manual
Diagnostics
2. Notify the customer both directors will set offline. Ensure the system
administrator quiesces Fibre Channel frame traffic through the directors and sets
attached devices offline.
3. Set both directors offline (Set Offline State on page 3–44).
4. At the Hardware View or Port Card View for the first director reporting the
problem, choose Configure > Operating Parameters > Switch Parameters. The
Configure Switch Parameters dialog box displays.
5. Type the customer-determined preferred domain ID value, then click Activate.
6. Repeat steps 4 and 5 at the Hardware View or Port Card View for the director
attached to the segmented E_Port (second director). Use a different preferred
domain ID value.
7. Set both directors online (Set Online State on page 3–43).
Did the domain ID change solve the problem and did both directors join through the
ISL to form a fabric?
NO YES
The directors, associated ISL, and multiswitch fabric are operational. Exit
MAP.
Contact the next level of support. Exit MAP.
16
A director E_Port segmented because two directors had incompatible zoning
configurations. An identical zone name is recognized in the active zone set for both
directors, but the zones contain different members.
1. Work with the system administrator to determine the desired zone name change
for one of the affected directors. Zone names must conform to the following rules:
The name must be 64 characters or fewer in length.
The first character must be a letter (a through z), upper or lower case.
Other characters are alphanumeric (a through z or 0 through 9), dollar sign ($),
hyphen (-), caret (^), or underscore (_).
2. Close the Product Manager application (Hardware View). The main HAFM or
Products View (still active) displays.