director 2/64 service manual

3–40 director 2/64 service manual
Repair Information
3. Gently wipe the end-face and other surfaces of the connector with an alcohol pad,
as shown in 2 on Figure 3–20. Ensure the pad makes full contact with the surface
to be cleaned. Wait approximately five seconds for cleaned surfaces to dry.
4. Repeat step 2 and step 3 of this procedure (second cleaning).
5. Repeat step 2 and step 3 of this procedure again (third cleaning), then reconnect
the fiber-optic cable to the port.
Power-On Procedure
To power-on the director:
1. One alternating current (AC) power cord is required for each power supply
installed. Ensure power cords connect facility power to the input power module at
the bottom rear of the director. If two power cords are installed for high
availability, plug the cords into separate facility power circuits.
WARNING: An HP-supplied power cord is provided for each director power
supply. To prevent electric shock when connecting the director to primary
facility power, use only the supplied power cords, and ensure the facility power
receptacle is the correct type, supplies the required voltage, and is properly
grounded.
2. At the bottom rear of the director, set the power switch (circuit breaker) to the up
position. The director powers on and performs power-on self-tests (POSTs).
During POSTs:
a. Amber LEDs on both CTP2 cards and all UPM cards illuminate momentarily.
b. The green LED on each CTP2 card (active and backup) illuminates as the
card is tested and UPM cards are tested.
c. Green LEDs associated with Fibre Channel ports sequentially illuminate as
the ports are tested.
3. After successful POST completion, the green power LED on the front bezel, green
LED on the active CTP2 card, and green PWR OK LEDs on both power supplies
remain illuminated.
4. If a POST error or other malfunction occurs, go to MAP 0000: Start MAP on page
2–12 to isolate the problem.