director 2/64 service manual
4–16 director 2/64 service manual
FRU Removal and Replacement
9. Restore communication to the port with the replacement transceiver as directed by
the customer (Unblock a Port on page 3–46). Inform the customer the port is
available for use.
10. Clear the amber system error LED on the director bezel:
a. At the Hardware View, right-click the front panel bezel graphic (away from a
FRU) to open a menu.
b. Click Clear System Error Light.
RRP: UPM Filler Blank
Use the following procedures to remove or replace a UPM filler blank. Filler blanks
cover and protect unused UPM card slots in the director chassis. A list of tools required is
provided.
Tools Required
The following tool is required to perform these procedures.
• Torque tool and hex adapter (provided with the director).
Removing a UPM Filler Blank
To remove a filler blank:
1. If the director is installed in a stand-alone configuration, go to step 2. If the
director is rack-mounted, unlock and open the cabinet front door as directed by the
customer representative.
2. Identify the filler blank to be removed.
3. The filler blank is secured to the director chassis with two captive Allen screws.
Both screws are spring-loaded to lock the filler blank in place.
4. Insert the torque tool (1) into each locking Allen screw in the filler blank (2).
Turn each screw counterclockwise until the spring releases and the tool turns
freely, as shown in Figure 4–6.
5. Pull the filler blank out and remove it from the director chassis.