FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide (AA-RSNGC-TE/958-000289-001, June 2003)

Index
Director 2/64 Installation Guide 147
P
PDU 56, 67
port addresses, FICON, configuring 99
port loopback diagnostic tests, fiber optic
loopback plug 34
POST 71
power module assembly 33
power supplies 29
power supply requirements 139
power switch 33, 34
POWER3 microprocessor 115
power-on self test 71
PowerPC microprocessor 115
precautions against electrostatic discharge 142
preferred domain ID 91
multi-switch fabric 90
principal switch, determining 95
ProComm Plus 36
product manager
SNMP agent 21
protective plug 35
R
r_a_tov 94
greater than e_d_tov 95
incompatible parameters 26
rack stability, warning 16
rear angle brackets 54
Regulatory Compliance identification numbers
128
regulatory compliance notices 127
related documentation 12
release notes 119
rerouting delay 92
RFC 1213
definition 23
S
safety
ESD grounding cable with wrist strap 36
fiber optic protective plug 35
SANtegrity Binding features
switch binding 97
SBAR assembly 32
segmentation
causes of 26
serviceability features 22
set director date and time manually 84
setting, online state 87
shelf brackets 50, 58
shortwave laser transceivers 31
single-mode fiber optic cables 31
site plan 41
SNMP agent
general description 21
SNMP trap messages
maximum recipients 23
Solaris operating system 115
SunOS operating system 115
Suppress RSCNs on zone set activations 92
switch
error-detection, reporting, and serviceability
features 22
multi-switch fabric 25
switch binding 97
switch parameters
domain RSCNs 92
insistent domain ID 91
NV-RAM storage 89, 93
preferred domain ID 91
rerouting delay 92
Suppress RSCNs on zone set activations 92
switch priority 95
related number codes 96
switch priority setting 96
switches, principal, determining 95
symbols in text 13
symbols on equipment 14
synchronize date and time 85
T
TCP/IP MIB-II
definition 23