FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide (AA-RSNGC-TE/958-000289-001, June 2003)
Installing and Configuring the Director 2/64
52 Director 2/64 Installation Guide
Figure 10: Securing shelf brackets
Secure the Mounting Hardware
Use these steps to secure the mounting hardware to the switch.
1. Locate the two front mounting brackets in the shipping carton.
2. Secure the front mounting brackets on either side of the switch, as shown in
Figure 11. For each front mounting bracket, use the two flathead countersunk
Phillips screws (10-32 x 0.25 in) provided.
1 Marker hole
2 Square opening in rail
3 Screws with captive lock and flat washers
4 Square alignment washers