FW 05.01.00 and SW 07.01.00 Director 2/64 Installation Guide (AA-RSNGC-TE/958-000289-001, June 2003)

Installing and Configuring the Director 2/64
66 Director 2/64 Installation Guide
2. Mount the switch in the rack, as shown in Figure 24:
a. On one side at the back of the switch, position an angle bracket (2) so
that the threaded holes (1) are against the slots (5) of the rear mounting
bracket and the angled side face out.
b. Insert the screws (6) through the rear mounting bracket slots into the
threaded nuts of the angle bracket.
c. Insert a second set of screws (4) through the angle bracket and the rail
column into the sheet metal nuts on the back rail (3).
d. Repeat step a through step c for the other side at the back of the switch.
e. At the front of the rack, insert the screws through the front mounting
brackets into the sheet metal nuts installed in the rail columns in step 1 of
Prepare the Front and Rear Rack Columns” on page 62.
f. Tighten all screws.
Figure 24: Securing the switch to the rack