FW 07.00.00/HAFM SW 08.06.00 HP StorageWorks Director 2/64 Installation Guide (AA-RSNGE-TE/958-000289-003, March 2005)

Director 2/64 installation guide 37
Secure the mounting hardware
Use these steps to secure the mounting hardware to the switch.
1. Locate the two front mounting brackets in the shipping carton.
2. Secure the front mounting brackets on either side of the switch (Figure 12).
For each front mounting bracket, use the two (2) flathead countersunk Phillips screws (10-32 x
0.25 in) provided.
Figure 12 Securing the two mounting brackets
3. Using a torque driver, torque the screws to 22 in/lb.
4. Locate the two (2) rear mounting plates in the shipping carton.
5. Secure the two (2) rear mounting plates to each side of the switch (Figure 12). For each plate,
use the two (2) flathead countersunk Phillips screws (10-32 x 0.25 in) provided.
6. Using a torque driver, torque the screws to 22 in/lb.
Insert the cage nuts
The following sections describe instructions for inserting front and rear cage nuts in the rack.
Insert the front cage nuts in the rack
Use these steps to insert the six supplied cage nuts in the rack’s front rails:
1. Select one of the front rails.
2. Count up eleven (11) square openings from the top screw of the shelf bracket, and insert the first
of three (3) cage nuts.