FW 07.00.00/HAFM SW 08.06.00 HP StorageWorks Director 2/64 Installation Guide (AA-RSNGE-TE/958-000289-003, March 2005)

Director 2/64 installation guide 47
NOTE: Two sheet metal nuts should be on each back column face (3).
Figure 22 Preparing the rear rack columns
Prepare the switch for installation
The following section describes how to install the mounting hardware that attaches the switch to the
rails. This hardware includes:
Two front mounting brackets
Two rear mounting plates
Eight 10-32, flat-head Phillips screws
Use these steps to secure the mounting hardware to the switch (Figure 23):
1. Locate the two front mounting brackets in the shipping carton.
2. Position the front mounting bracket (5) so that the bracket’s angled side faces out and is on the
upper part of switch side.
3. Attach the bracket with 10-32, flat-head Phillips screws (4) using the two center threaded holes
on the front side of the switch.