FW 07.00.00/HAFM SW 08.06.00 McDATA Intrepid 6064 Director Installation and Service Manual (620-000108-920, April 2005)

4
4-52
Intrepid® 6064 Director Installation and Service Manual
Repair Information
Power-On Procedure
DANGER
Use the supplied power cords. Ensure the facility power receptacle is
the correct type, supplies the required voltage, and is properly
grounded.
To power on the director:
1. One alternating current (AC) power cord is required for each
power supply installed. Ensure power cord(s) connect facility
power to the input power module at the bottom rear of the
director.
NOTE: If two power cords are installed for high availability, plug the
cords into separate facility power circuits.
2. At the bottom rear of the director, set the power switch (circuit
breaker) to the up position. The director powers on and performs
power-on self-tests (POSTs). During POSTs:
Amber LEDs on both CTP2 cards and all port cards illuminate
momentarily.
Green LED on each CTP2 card (active and backup) and each
port card illuminate as the card is tested.
Green LEDs associated with Fibre Channel ports sequentially
illuminate as the ports are tested.
3. After successful POST completion, the green power LED on the
front bezel, green LED on the active CTP2 card, and green PWR
OK LEDs on both power supplies remain illuminated.
4. If a POST error or other malfunction occurs, go to MAP 0000: Start
MAP on page 3-9 to isolate the problem.
NOTE: When powering on the director after removing and replacing a
faulty FRU, the amber system error LED may remain illuminated. Clear
the system error LED as part of the replacement procedure.