FW 07.00.00/HAFM SW 08.06.00 McDATA Intrepid 6064 Director Installation and Service Manual (620-000108-920, April 2005)

2
2-12
Intrepid® 6064 Director Installation and Service Manual
Installation Tasks
NOTE: Ensure each hub is connected to a separate rack power strip.
7. Inspect the front panel of each hub. Ensure each green Power
LED illuminates.
Task 3: Install the Director
CAUTION
Use safe lifting practices when moving the product.
This task provides instructions to unpack the director, install the
director in a rack-mount configuration, and perform initial
configuration functions.
NOTE: If the director is delivered as part of a FC-512 Fabricenter equipment
cabinet, refer to the McDATA FC-512 Fabricenter Equipment Cabinet Installation
and Service Manual (620-000100) for unpacking and installation instructions.
Turn-on director power (Subtask C: Turn-on Director Power on page 2-13) and
go to Task 5: Install the Management Server on page 2-20.
Subtask A: Unpack and Inspect the Director
Unpack and inspect the director.
1. Inspect the shipping containers for damage caused during transit.
If a container is damaged, ensure a representative from the freight
carrier is present when the container is opened.
2. Unpack the shipping containers and inspect each item for
damage. Ensure the items match the items listed on the bill of
materials (BOM).
3. If any items are damaged or missing, contact the McDATA
Solution Center:
Phone: (800) 752-4572 or (720) 566-3910
Fax: (720) 566-3851
E-mail: support@mcdata.com