FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Director 2/64 Installation Guide (AA-RSNGD-TE, July 2004)

Installing and Configuring the Director
59Director 2/64 Installation Guide
Prepare the Front and Rear Rack Columns
Use the following procedure to prepare the rack for installing a switch:
1. Prepare the front rack columns, as shown in Figure 21:
a. Standing at the front of the rack, count up from the top of the rail tray (1)
to the 13th, 19th, and 23rd holes on the rack's front face.
b. Slide a sheet metal nut (2) on each of the located holes.
Note: Three sheet metal nuts should be on each front column face (3).
Figure 21: Preparing the front rack columns
2. Prepare the rear rack columns, as shown in Figure 22:
a. Standing at the back of the rack, count up from the top of the rail tray (1)
to 12th and 28th on the rack’s back face.
b. Slide a sheet metal nut (2) on each of the located holes.