FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Director 2/64 Installation Guide (AA-RSNGD-TE, July 2004)

Installing and Configuring the Director
60 Director 2/64 Installation Guide
Note: Two sheet metal nuts should be on each back column face (3).
Figure 22: Preparing the rear rack columns
Prepare the Switch for Installation
The following section describes how to install the mounting hardware that
attaches the switch to the rails. This hardware includes:
Two front mounting brackets
Two rear mounting plates
Eight 10-32, flat-head Phillips screws
Use these steps to secure the mounting hardware to the switch, as shown in
Figure 23:
1. Locate the two front mounting brackets in the shipping carton.
2. Position the front mounting bracket (5) so that the bracket’s angled side faces
out and is on the upper part of switch side.