FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Director 2/64 Service Manual (AA-RS2ED-TE, July 2004)

Repair Information
200 Director 2/64 Service Manual
Power-On Procedure
To power on the director:
1. One alternating current (AC) power cord is required for each power supply
installed. Ensure power cords connect facility power to the input power
module at the bottom rear of the director. If two power cords are installed for
high availability, plug the cords into separate facility power circuits.
WARNING: An HP-supplied power cord is provided for each director power
supply. To prevent electric shock when connecting the director to primary
facility power, use only the supplied power cords, and ensure the facility power
receptacle is the correct type, supplies the required voltage, and is properly
grounded.
2. At the bottom rear of the director, set the power switch (circuit breaker) to the
up position. The director powers on and performs power-on self-tests
(POSTs). During POSTs:
a. Amber LEDs on both CTP2 cards and all UPM cards illuminate
momentarily.
b. The green LED on each CTP2 card (active and backup) illuminates as the
card is tested and UPM cards are tested.
c. Green LEDs associated with Fibre Channel ports sequentially illuminate
as the ports are tested.
3. After successful POST completion, the green power LED on the front bezel,
green LED on the active CTP2 card, and green PWR OK LEDs on both
power supplies remain illuminated.
4. If a POST error or other malfunction occurs, go to “MAP 0000: Start MAP
on page 46 to isolate the problem.
Note: When powering on the director after removing and replacing a faulty FRU, the
amber system error LED may remain illuminated. Clear the system error LED as part of
the replacement procedure.