FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Director 2/64 Service Manual (AA-RS2ED-TE, July 2004)

FRU Removal and Replacement
229Director 2/64 Service Manual
Remove and Replace FRUs
This section describes procedures to remove and replace director FRUs, along
with a list of tools required to perform each procedure. In addition, the section
provides:
ESD information.
A list of concurrent FRUs. Concurrent FRUs can be removed and replaced
while the director is powered on and operational.
A list of non-concurrent FRUs. Non-concurrent FRUs can only be removed
and replaced after the director is powered off.
See “Illustrated Parts Breakdown” on page 265 for FRU locations and part
numbers.
ESD Information
When performing procedures described in this section, follow all ESD
procedures, WARNING statements, and CAUTION statements.
Caution: To avoid causing machine errors or damage while working on the
director, follow ESD procedures by connecting a grounding cable to the
director chassis and wearing an ESD wrist strap.
The ESD grounding point for the front of the chassis (1) is located at the bottom
center, adjacent to the left power supply, as shown in Figure 72. Touch the chassis
once before performing any maintenance action, and once each minute while
removing or replacing FRUs.
If the director is not connected to facility power (and therefore not grounded),
connect the ESD wrist strap to an approved bench grounding point instead of the
chassis.
Figure 72: ESD grounding point (front)
PW
R
O
K
FAULT
TEM
P
ILIM
1