FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Director 2/64 Service Manual (AA-RS2ED-TE, July 2004)
Diagnostics
59Director 2/64 Service Manual
25
Is the power LED (green) at the director front bezel illuminated?
NO YES
↓ Go to step 30.
26
Is the director connected to facility AC power and powered on?
NO YES
↓ Go to step 29.
27
Connect the director to facility AC power and set the power switch (circuit
breaker) at the rear of the director to the ON (up) position. Inspect the director for
indications of being powered on, such as:
■ At the front bezel, an illuminated power LED (green) or system error LED
(amber).
■ An illuminated green LED on the active CTP2 card, and illuminated green
PWR OK LEDs on both power supplies.
■ Audio emanations and airflow from cooling fans.
Is the director powered on?
YES NO
↓ A power distribution problem is indicated. Go to step 23 to obtain
event codes. If no event codes are found, go to “MAP 0100: Power
Distribution Analysis” on page 71. Exit MAP.










