HP StorageWorks M-series Rack Mount Kit Installation Instructions (AA-RQZPE-TE, July 2004)
Installation Instructions
19M-series Rack Mount Kit Installation Instructions
Attaching the Mounting Hardware to the Director 2/64
Use these steps to secure the mounting hardware to the switch.
Note: All mounting brackets are attached to the switch using 10/32 x 0.375-inch
flathead countersunk Phillips screws.
1. Locate the two front mounting brackets in the shipping carton.
2. Secure the front mounting brackets on either side of the switch, as shown in
Figure 3. For each front mounting bracket, use two screws.
.
.
Figure 3: Securing the front and rear mounting brackets
3. Using a torque driver, torque the screws to 22 in-lbs.
4. Locate the two rear mounting brackets in the shipping carton.
5. Secure the two rear mounting brackets to each side of the switch, as shown in
Figure 3. For each bracket, use two screws.
6. Using a torque driver, torque the screws to 22 in-lbs.
SHR-2321
StorageWorks SAN 64