HP StorageWorks M-series Rack Mount Kit Installation Instructions (AA-RQZPE-TE, July 2004)

Installation Instructions
21M-series Rack Mount Kit Installation Instructions
Finalizing the Rack Mounting Procedure
Read the following sections to complete the installation procedure.
After completing the steps outlined in the previous section, prepare to orient the
Director 2/64 in the rack as follows. The procedure requires two technicians.
Caution: The Director 2/64 weighs approximately 115 lbs. Do not attempt to
lift or carry the Director 2/64 with fewer than two people. Failure to observe
this CAUTION may result in injury to personnel or damage to the
Director 2/64.
1. Carefully lift the switch into the rear of the cabinet. Slide the switch forward
until the edge of the front mounting brackets are approximately 1 inch from
the rack’s rails, as shown in Figure 4.
Figure 4: Aligning the switch in the rack
SHR-2322