HP StorageWorks M-series Rack Mount Kit Installation Instructions (AA-RQZPE-TE, July 2004)
Installation Instructions
25M-series Rack Mount Kit Installation Instructions
Power-On Self Test
Use the following steps to run a Power-On Self Test (POST).
1. Power on the PDU (or PDUs if the optional one is installed).
2. At the bottom rear of the Director 2/64, set the power switch (circuit breaker)
to the Up position. The Director 2/64 powers on. The following occurs during
POST.
a. Amber LEDs on both CTP cards and all FPM cards illuminate
momentarily.
b. The green LED on each CTP card (active and backup) lights as the card is
tested and FPM cards are tested.
c. Green LEDs associated with Fibre Channel ports sequentially illuminate
as the ports are tested.
3. After successful POST completion, the green power LED on the front bezel,
green LED on the active CTP card, and green PWR OK LEDs on both power
supplies remain illuminated.
4. If a POST error or other malfunction occurs, refer to the “Maintenance
Analysis Procedures” section in the HP StorageWorks Director 2/64 Service
Manual.