HP StorageWorks Universal Port Module Kit Installation Instructions (AA-RS22D-TE, July 2004)

Installation Instructions
18 Universal Port Module Kit Installation Instructions
Figure 3: ESD grounding point (rear)
Removing the UPM Filler Blank
Use the following procedure to remove a UPM filler blank. Filler blanks cover and
protect unused UPM card slots in the director chassis. A list of required tools is
provided.
Required Tools
The torque tool and hex adapter (provided with the director) are required to
perform the installation procedures.
Removal
To remove a filler blank:
1. Unlock and open the cabinet front door if the director is rack-mounted and
installed in a custom equipment cabinet. If the director is installed in a
stand-alone configuration, go to step 2.
2. Identify the filler blank to be removed.
The filler blank is secured to the director chassis with two captive Allen screws.
Both screws are spring-loaded to lock the filler blank in place.
1 ESD Grounding Point
SHR 2300
1