m-series rack mount kit installation instructions
Installation Instructions
11m-series rack mount kit installation instructions
WARNING: HP-supplied power cords are provided for each Director 2/64 power
supply. To prevent electric shock, use only the supplied power cord(s). Also,
verify that the facility power receptacle is the correct type, supplies the required
voltage, and is properly grounded.
9. Connect the equipment rack power cords to separate (for redundancy) facility
power sources, providing single-phase, 120 to 240 VAC current.
Power-On Self Test
Use the following steps to run a Power-On Self Test (POST).
1. Power on the PDU (or PDUs if the optional one is installed).
2. At the bottom rear of the Director 2/64, set the power switch (circuit breaker) to
the Up position. The Director 2/64 powers on. The following occurs during POST.
a. Amber LEDs on both CTP cards and all FPM cards illuminate momentarily.
b. The green LED on each CTP card (active and backup) lights as the card is
tested and FPM cards are tested.
c. Green LEDs associated with Fibre Channel ports sequentially illuminate as
the ports are tested.
3. After successful POST completion, the green power LED on the front bezel, green
LED on the active CTP card, and green PWR OK LEDs on both power supplies
remain illuminated.
4. If a POST error or other malfunction occurs, refer to the “Maintenance Analysis
Procedures” section in the hp StorageWorks director 2/64 service manual.
Further Setup
For additional information on installing and configuring the Director 2/64, please see
the hp StorageWorks director 2/64 installation guide.