FW 07.00.00/HAFM SW 08.06.00 HP StorageWorks Edge Switch 2/32 Installation Guide (AA-RSTZE-TE/958-000290-003, March 2005)
Installing and configuring the Edge Switch 2/3236
4. Enter the switch IP address (determined by the customer’s network administrator) in the IP
Address field.
5. Enter the switch subnet mask (determined by the customer’s network administrator) in the Subnet
Mask field.
6. At the Data Source for Domain area of the dialog box, select the Use auto detection, Use the
server, or Use a specific RDC radio button (determined by the customer’s network administrator).
7. Click OK to save the entered information, close the dialog box, and define the switch to the
HAFM application.
8. Repeat step 2 through step 7 for each new switch.
9. Click OK to close the Discover Setup dialog box and return to the HAFM application.
Verify Communication between the switch and the HAFM appliance
Communication must be verified between the switch and the HAFM appliance Element Manager
and EWS applications. To verify switch-to-appliance communication:
1. At the management application’s main window (physical map or product list), inspect the shape
and color of the status symbol associated with the Edge Switch product icon. Table 3 explains
the symbols and associated operational states.
2. Right-click the switch icon at the HAFM application’s physical map. A pop-up menu appears.
Table 3 Switch operational states and symbols
Operational state Symbol
Operational—switch-to appliance communication is established, the
switch is operational, and no failures are indicated. Go to ”Set Switch
date and time” on page 38. (
Degraded—switch-to-appliance communication is established, but the
switch is operating in degraded mode and requires service. This
condition is typical if a port or redundant FRU fails. Go to step 2.
Failed—switch-to appliance communication is established, but the switch
failed and requires immediate service. Go to step 2.
Status Unknown—the switch status is unknown because of a network
communication failure between the switch and HAFM appliance.
Go to step 2.