FW 08.01.00 McDATA® Sphereon 3032 and 3232 Fabric Switches Installation and Service Manual (620-000155-220, November 2005)
Table Of Contents
- Preface
- General Information
- Installation Tasks
- Factory Defaults
- Installation Options
- Summary of Installation Tasks
- Task 1: Verify Installation Requirements
- Task 2: Unpack, Inspect, and Install the Ethernet Hub (Optional)
- Task 3: Unpack, Inspect, and Install the Switch
- Task 4: Configure Network Information
- Task 5: LAN-Connect the Switch
- Task 6: Unpack, Inspect, and Install the Management Server
- Task 7: Configure Management Server Password and Network Addresses
- Task 8: Configure Management Server Information
- Task 9: Configure Windows 2000 Users
- Task 10: Set Management Server Date and Time
- Task 11: Configure the Call-Home Feature (Optional)
- Task 12: Assign User Names and Passwords
- Task 13: Configure the Switch to the Management Application
- Task 14: Record or Verify Management Server Restore Information
- Task 15: Verify Switch-to-Management Server Communication
- Task 16: Configure PFE Key (Optional)
- Task 17: Configure Management Server (Optional)
- Flexport
- Open Trunking
- Task 18: Set Switch Date and Time
- Task 19: Configure the Sphereon 3032/3232 Element Manager Applications
- Task 20: Configure Switch Operating Parameters
- Task 21: Configure Fabric Operating Parameters
- Fabric Parameters
- Configure Ports (Open Systems Mode)
- Configure Ports (FICON Mode)
- Configure Port Addresses (FICON Mode)
- Configure SNMP Trap Message Recipients
- Configure and Enable E-mail Notification
- Configure and Enable Ethernet Events
- Configure and Enable Call-Home Event Notification
- Configure Threshold Alerts
- Procedures
- Task 22: Configure Open Trunking
- Task 23: Test Remote Notification (Optional)
- Task 24: Back Up Configuration Data
- Task 25: Configure the Switch from the EFCM Basic Interface (Optional)
- Configure Product Identification
- Configure Date and Time
- Configure Parameters
- Configure Fabric Parameters
- Configure Network Information
- Configure Basic Port Information
- Configure Port BB_Credit
- Configure Port NPIV
- Configure SNMP
- Enable CLI
- Enable or Disable Host Control
- Configure SSL Encryption
- Install PFE Keys (Optional)
- Configure Security
- Configure Interswitch Links
- Task 5: Configure Product Network Information (Optional)
- Task 26: Cable Fibre Channel Ports
- Task 27: Connect Switch to a Fabric Director (Optional)
- Task 28: Register with the McDATA File Center
- Diagnostics
- Maintenance Analysis Procedures
- MAP 0000: Start MAP
- MAP 0100: Power Distribution Analysis
- MAP 0200: POST, Reset, or IPL Failure Analysis
- MAP 0300: Console Application Problem Determination
- MAP 0400: Loss of Console Communication
- MAP 0500: Fan and CTP Card Failure Analysis
- MAP 0600: Port Failure and Link Incident Analysis
- MAP 0700: Fabric, ISL, and Segmented Port Problem Determination
- MAP 0800: Server Hardware Problem Determination
- Repair Information
- Factory Defaults
- Procedural Notes
- Using Log Information
- Using Views
- FRU List View
- Performing Port Diagnostics
- Swapping Ports
- Collecting Maintenance Data
- Clean Fiber-Optic Components
- Power-On Procedure
- Power-Off Procedure
- Reset or IPL the Switch
- Set the Switch Online or Offline
- Block and Unblock Ports
- Manage Firmware Versions
- Manage Configuration Data
- Install or Upgrade Software
- FRU Removal and Replacement
- Illustrated Parts Breakdown
- Messages
- Event Code Tables
- Restore EFC Server
- Consolidating EFC Servers in a Multiswitch Fabric
- Glossary
- Index

g-28
McDATA® Sphereon 3032 and 3232 Fabric Switches Installation and Service Manual
Glossary
inband management Management of the director or switch through Fibre Channel. An
interface connection to a port card. Contrast with out-of-band manage-
ment.
initial machine load IML. Hardware reset for all installed control processor (CTP) cards on
the director or switch. This reset does not affect other hardware. It is
initiated by pushing the IML button on a director’s or switch’s oper-
ating panel.
initial program load IPL. The process of initializing the device and causing the operating
system to start. An IPL may be initiaded through a menu option or a
hardware button.
initial program load
configuration
IPL configuration. In S/390 mode, information stored in a director or
switch’s nonvolatile memory that contains default configurations.
The director or switch loads the file for operation when powered on.
Institute of Electrical
and Electronics
Engineers
IEEE. An organization of engineers and technical professionals that
promotes the development and application of electronic technology
and allied sciences.
integrated product Hardware product that is mounted in the Fabricenter cabinet. For
example, any director or switch shipped with in the Fabricenter cabi-
net is an integrated product.
interface (1) A shared boundary between two functional units, defined by
functional, signal, or other characteristics. The concept includes the
specification of the connection of two devices having different func-
tions (T). (2) Hardware, software, or both, that link systems, pro-
grams, or devices (D).
Internet protocol IP. Network layer for the transmission control protocol/Internet pro-
tocol (TCP/IP) protocol used on Ethernet networks. IP provides
packet routing, fragmentation, and reassembly through the data link
layer (D).
Internet protocol
address
IP address. Unique string of numbers (in the format xxx.xxx.xxx.xxx)
that identifies a device on a network.
interoperability Ability to communicate, execute programs, or transfer data between
various functional units over a network.










