FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Edge Switch 2/32 Installation Guide (AA-RSTZD-TE, July 2004)

Introduction
30 Edge Switch 2/32 Installation Guide
Figure 4: Fiber-Optic protective plug
Null modem cable—An asynchronous RS-232 null modem cable as shown
in Figure 5 is required to configure switch network addresses and acquire
event log information through the maintenance port. The cable has nine
conductors and DB-9 male and female connectors.
Figure 5: Null modem cable
Tools Supplied by Service Personnel
The following tools are expected to be supplied by service personnel performing
switch installation or maintenance actions. Use of the tools may be required to
perform one or more test, service, or verification tasks.
Scissors or pocket knife—A sharp cutting edge (scissors or knife blade) may
be required to cut the protective strapping when unpacking replacement
FRUs.