FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Edge Switch 2/32 Installation Guide (AA-RSTZD-TE, July 2004)

Installing and Configuring the Edge Switch 2/32
45Edge Switch 2/32 Installation Guide
Unpack and Inspect the Switch
This section provides instructions for unpacking and inspecting the Edge
Switch 2/32 and installing it in a desktop or rack-mount configuration.
To unpack and inspect the switch:
Caution: When you remove the switch from the carton, do not rest it on its
rear window while examining it. To do so may break the FRU handles.
1. Inspect the shipping containers for damage caused during transit. If a
container is damaged, ensure a representative from the freight carrier is
present when the container is opened.
2. Unpack the shipping containers and inspect each item for damage. Save all
shipping and packing materials. Ensure that all items on the enclosed shipping
list are in each container.
3. If any items are damaged or missing, customers should contact an HP
authorized service provider or reseller.