FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Edge Switch 2/32 Installation Guide (AA-RSTZD-TE, July 2004)
Installing and Configuring the Edge Switch 2/32
46 Edge Switch 2/32 Installation Guide
Install the Edge Switch on a Desktop
To install and configure the switch on a desktop:
1. Remove the backing from the four adhesive rubber pads and apply the pads to
the underside of the switch. Ensure that the pads are aligned with the scribed
circles at each corner.
2. Position the switch on a table or desktop as directed by the customer. Ensure:
■ Grounded AC electrical outlets are available.
■ Adequate ventilation is present.
■ Areas with excessive heat, dust, or moisture are avoided.
■ All planning considerations are met. Refer to the HP StorageWorks
HA-Fabric Manager User Guide.
3. Verify that all FRUs are installed as ordered.
4. Verify that the SFP optical transceivers are installed as required for your
installation.
5. Connect the U.S. or country-specific (optional) AC power cords to the right
(PS0) and left (PS1) receptacles at the rear of the chassis.
WARNING: An HP-supplied power cord is provided for each switch power
supply. To prevent electric shock when connecting the switch to primary facility
power, use only the supplied power cords, and ensure that the facility power
receptacle is the correct type, supplies the required voltage, and is properly
grounded.
6. Connect the remaining ends of the AC power cords to separate facility power
sources that provide single-phase, 120 to 240 volt alternating current (VAC).
This provides power redundancy.
7. Turn on the power. Two power switches are on the back of the unit. Turn on
both switches. The unit powers on and performs power-on self-tests (POSTs).
During POSTs:
a. The green power (PWR) LED on the front panel turns On.
b. The amber system error (ERR) LED on the front panel flashes
momentarily while the switch is tested.
c. The green LEDs associated with the Ethernet port flash momentarily
while the port is tested.










