FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Edge Switch 2/32 Installation Guide (AA-RSTZD-TE, July 2004)
Installing and Configuring the Edge Switch 2/32
57Edge Switch 2/32 Installation Guide
4. Enter the switch IP address (determined by the customer’s network
administrator) in the IP Address field.
5. Enter the switch subnet mask (determined by the customer’s network
administrator) in the Subnet Mask field.
6. At the Data Source for Domain area of the dialog box, select the Use auto
detection, Use the server, or Use a specific RDC radio button (determined by
the customer’s network administrator).
7. Click OK to save the entered information, close the dialog box, and define the
switch to the HAFM application.
8. Repeat step 2 through step 7 for each new switch.
9. Click OK to close the Discover Setup dialog box and return to the HAFM
application.
Verify Communication Between Switch and HAFM appliance
Communication must be verified between the switch and the HAFM appliance
Element Manager and EWS applications. To verify switch-to-appliance
communication:
1. At the management application’s main window (physical map or product list),
inspect the shape and color of the status symbol associated with the Edge
Switch product icon. Table 3 explains the symbols and associated operational
states.
Table 3: Switch Operational States and Symbols
Operational State Symbol
Operational—switch-to appliance communication is established,
the switch is operational, and no failures are indicated. Go to “Set
Switch Date and Time” on page 59.
Degraded—s
witch-to-appliance communication is established, but
the switch is operating in degraded mode and requires service. This
condition is typical if a port or redundant FRU fails.
Go to step 2.
Failed—switch-to appliance communication is established, but the
switch failed and requires immediate service. Go to step 2.
Status Unknown—the switch status is unknown because of a
network communication failure between the switch and HAFM
appliance. Go to step 2.