FW V06.XX/HAFM SW V08.02.00 HP StorageWorks Edge Switch 2/32 Service Manual (AA-RS2GD-TE, July 2004)
Diagnostics
55Edge Switch 2/24 Service Manual
YES NO
↓ One or both power supplies appear operational, but a power
distribution failure through the CTP card is indicated. Go to step 17.
14
Ensure both power supplies are correctly installed and seated in the switch. If
required, partially remove and reseat the power supplies. Refer to “RRP: Power
Supply” on page 186.
Was a corrective action performed?
YES NO
↓ Go to step 16.
15
Verify operation of both power supplies.
1. Inspect the power supplies and ensure the green LED is illuminated.
2. At the HAFM appliance Hardware View, observe the graphics representing
the power supplies and ensure a failure symbol (blinking red and yellow
diamond) does not appear.
Is a dual power supply failure still indicated?
YES NO
↓ The switch appears operational. Exit MAP.
16
Both power supplies failed and must be removed and replaced. Refer to “RRP:
Power Supply” on page 186.
■ Perform the data collection procedure as part of FRU removal and
replacement.
■ Connect the switch to facility AC power after both power supplies are
replaced.
Did dual power supply replacement solve the problem?
NO YES
↓ The switch appears operational. Exit MAP.










