HP StorageWorks Data Replication Manager HSG80 ACS Version 8.7P Configuration Guide (AA-RPHZF-TE, March 2004)

Introduction to Data Replication Manager
28 Data Replication Manager HSG80 ACS Version 8.7P Configuration Guide
Hardware Configurations
Figures shown previously in this chapter have reflected the build of a DT solution for each of
two types of rack configurations. Figure 8 shows a completed DT setup for the ESA12000
rack. Figure 9 shows a completed DT setup for the EMA12000 modular storage rack.
Note: If you prefer to join racks for more storage capacity, follow the instructions in the rack
documents.
Be sure to establish the same setup at both the initiator and target sites. Keep in mind that an
additional rack will not include switches or controllers. It does, however, include a PDU and is able
to support redundant power.
.
Figure 8: Fibre Channel-based ESA12000 DT storage subsystem (with fully-redundant power)
1 Cache battery
2 SBBs
3 Controllers
4 Fibre Channel
switches, 8- or 16
port
5 Redundant power
distribution unit
CXO7433A
1
2
3
4
5