HP StorageWorks ESL E-Series Tape Library Unpacking and Installation Guide (350800-011, May 2010)
Table Of Contents
- HP StorageWorks ESL E-Series Tape Library
- 1 Unpacking the library
- 2 Installing the library
- 3 Loading tape cartridges
- 4 Configuring the library
- 5 Support and other resources
- Index
NOTE:
More information on the electrical requirements is provided in the
HP StorageWorks ESL E-Series
Pre-Installation Site Survey
.
WARNING!
To avoid damage to the library and risk to personal safety, the library must be connected to a grounded
electrical outlet.
Environmental conditions
The installation site must have the following environmental conditions:
• Humidity: 20%-80% noncondensing
• Temperature: 15ºC to 32ºC (59ºF to 90ºF)
• Altitude: sea level to 10,000 feet
These environmental conditions apply when the library is in operation.
NOTE:
For additional library specifications (including environmental requirements during shipping and
storage), see the
HP StorageWorks ESL E-Series Tape Library User Guide
.
Preparing for the installation
Preparations needed before installing the library are described in:
• “Tools for installation” on page 13
• “Taking ESD precautions” on page 14
Tools for installation
These tools are needed for unpacking and setting up the library:
• #2 Phillips screwdriver
• Snips for metal bands
• Safety goggles
• Ratchet with 3/8-inch socket (or 3/8-inch open-end wrench)
• Ratchet with 3/4-inch socket (or 3/4-inch open-end wrench)
• Ratchet with 7/16-inch socket (or 7/16-inch open-end wrench)
• Carpenter's level
NOTE:
A 12-inch socket extension is recommended for removing the counter-weight shipping restraint.
HP StorageWorks ESL E-Series Tape Library 13