HP StorageWorks 4x00/6x00/8x00 Enterprise Virtual Array updating product software guide (XCS 6.200) (5697-7958, February 2009)

Figure 9 Controller Events (Initialized system) window
d. Check the Severity eld to determine if any unexpected Critical events
have occurred.
If Critical events have occurred, perform the steps outlined in the corrective action codes to
correcttheproblems. Insomecases,itmaybenecessarytocallyourHP-authorizedservice
representative to xtheproblem.
3. Verify that no changes to the storage system conguration are in progress. For example, you should
not be in the process of creating a virtual disk. Conguration changes should not be made within 48
hours b efore beginning the upgrade. Proactive event notication can be used to alert you if a critical
event occurs d uring the 48 hours before the upgrade.
NOTE:
The leveling process does not i mpact the upgrade. If leveling is in progress, the upg rade
can be p erformed. The leveling will be suspended during the upgrade and resumed
when the upgrade is complete.
Ensure you suspend any processes or applications that may change the storage system
conguration, such as backups and snapshot creation or deletion. Stop an y HP Storage
System Scripting Utility scripts that are scheduled to run automatically.
Preparing an HP Continuous Access EVA environment for
upgrading
Estimated time to complete: Varies depending on replication conguration
When to perform: As close as possible to the upgrade
When upgrading an EVA in an HP Continuous Access EVA environment, the following requirements must
be met. See HP StorageWorks Continuous Access EVA administrator guide for more information.