HP EVA4000/6000/8000 and EVA4100/6100/8100 Updating Product Software Guide (XCS 6.250) (5697-1716, February 2012)

Table 5 Pre-upgrade task checklist (continued)
Task completeTask
“Preparing an HP P6000 Continuous Access environment for upgrading” (page 34)
Time required: Varies depending on replication configuration
When to perform: As close as possible to the upgrade
“Saving storage system configuration information” (page 36)
Time required: 10–15 minutes
When to perform: As close as possible to the upgrade
38 Pre-upgrade tasks