Compaq StorageWorks Getting Started RAID Array 3000 for Microsoft Windows Installation Guide (AA-RACZD-TE, January 2001)
3-4 Getting Started RAID Array 3000 for Microsoft Windows Installation Guide
Compaq Confidential – Need to Know Required
Writer: Bob Young Project: Getting Started RAID Array 3000 for Microsoft Windows Installation Guide Comments:
Part Number: AA-RACZD-TE File Name: d-ch3 Unpacking and Setting Up the RAID Array 3000 Controller Shelf.doc Last Saved On: 12/4/00 2:28 PM
Place the UPS On/Off switch in the On position. UPS battery recharge time is
from 4 to 6 hours. You can begin configuring the RAID Array 3000 while the
UPS is charging, but do not attempt to fully utilize the storage system with
data transfers before the UPS battery is fully charged. I/O transfers during a
UPS battery charging cycle could result in a loss of data. For example, a
device drive shelf could fail during a transfer due to insufficient battery
current.
For UPS operating instructions, refer to the UPS User’s Guide packed with the
UPS. Observe all Cautions and Warnings in the UPS User’s Guide.










