SAN switch universal rack mount kit installation addendum

Pen-and-ink Changes
2 SAN Switch Universal Rack Mount Kit Installation Addendum
This addendum consists two parts:
Pen-and-ink Changes—provides instructions for locating specific text and
either deleting text, replacing text with new text, or adding new text at a
specific location.
Page Additions—identifies where to add a page at a specific place in the
document and recommends how to attach the replacement pages.
Note: If the changes within this addendum are not incorporated into the specified
documents and then used, problems might arise from using obsolete information.
Pen-and-ink Changes
There are no pen-and-ink changes in this addendum.
Page Additions
The following pages describe the installation of the SAN Switch 2/32, SAN
Switch 2/16, and SAN Switch 2/8 in an HP Series 9000 or comparable EIA rack,
or in an HP System/e rack using the SAN Switch Universal Rack Mount Kit, part
number 331148-B21.
For each document, insert the following sheets as shown here:
1. After page 30 in the HP StorageWorks SAN Switch 2/32 Installation Guide
2. After page 29 in the HP StorageWorks SAN Switch 2/16 Installation Guide
3. After page 32 in the HP StorageWorks SAN Switch 2/8 Installation Guide