6.1 HP IBRIX X9000 Network Storage System Installation Guide (TA768-96058, June 2012)

Review the information on the Configuration Summary that appears next, and select Commit.
The wizard now sets up the blade.
8. The wizard performs several checks:
Verifies the VC firmware
Validates the chassis configuration
Verifies VC authentication
Sets up the hpspAdmin iLO user account
Verifies SAS firmware
Verifies SAS configuration
Validates the storage RAID LUN configuration
During the checks, you will be asked for authentication information for blade1.
126 Expanding an X9720 or X9320 10GbE cluster by an X9730 module