HP X5000 G2 Network Storage System Administrator Guide

4. Remove the server blade (Figure 139 (page 119)):
a. Push the button to release the handle (1).
b. Pull the handle toward you (2).
c. Remove the server blade (3).
Figure 139 Removing the server blade
5. Press the release button on the access panel and slide the access panel to the left to it. The
Mezzanine NIC is under the controller card.
6. The 1210m cache module is connected to a capacitor pack, so observe the cache module
LEDs (Figure 27 (page 37)):
If the amber LED is solid, data transfer to the flash device on the cache module is in
progress. Do not remove the controller card until the amber LED is off, and then continue
with the next step.
If the amber LED is not lit, proceed to the next step.
7. Loosen the three captive screws and remove the Mezzanine NIC.
Replacing the Mezzanine NIC
To replace the Mezzanine NIC:
1. Install the Mezzanine NIC, press down on the connector to seat the board (1, Figure 140
(page 119)), and then tighten the captive screws (2).
Figure 140 Installing the Mezzanine NIC
2. Reinstall the controller card, and then install the access panel.
3. Install the server blade in the enclosure. If necessary, power on the blade by pressing the
power button on the front of the server blade.
4. Confirm the firmware version.
NOTE: You must reboot the storage solution after updating the Mezzanine NIC and server
blade firmware.
Removing and replacing the Mezzanine NIC 119