HP StoreEver Enterprise Systems Library (ESL) G3 Tape Library Controller Hardware Revision 2 Robot Replacement Instructions
Figure 10 Lining up robot rollers with cutouts in gear racks (not yet engaged)
1. Top view rollers
2. Bottom view rollers
3. Middle view rollers
8. Hold the robot at the lift points in the middle of the vertical rails, and push it firmly toward the
back of the library until it hits the full back position shown in Figure 9 and the mushroom button
hits the bottom.
9. Hold the robot at the lift points in the middle of the vertical rails. While maintaining pressure
toward the back of the library, slide the robot to the right into the load position. See Figure 9.
CAUTION: Be careful not to grasp the vertical rail in your right hand, as you could injure your
hand when sliding the robot to the right.
The mushroom button slips down through the hole in the install bracket, and the robot drops down
slightly into position. The robot is now in the proper position.
18 Step 4: Installing the new robot










