HP StoreEver Enterprise Systems Library (ESL) G3 Tape Library Controller Hardware Revision 2 Robot Replacement Instructions

Figure 13 Verifying the robot is vertical by checking scribe lines
1. Scribe line locations in right-most module (for dual robot libraries)
2. Yellow scribe line locations in control module or left-most module
13. Slide the robot 25 to 50 mm (1 in to 2 in) to the left until the collectors are positioned in front of
the power rail load guides.
Step 4: Installing the new robot 21