HP StoreEver Enterprise Systems Library (ESL) G3 Tape Library Power Supply (+48v 1500w) Installation and Replacement Instructions (QP008-96004, May 2013)

2. If the library was powered off for this procedure,
press the Power button on the indicator panel to
power it back on.
The library begins to boot up. A library with only
a few drives usually will be fully powered on and
ready for use within 10 minutes. However, if a
library is large with a high number of drives, it
can take more than an hour for the library to fully
power on, complete its discovery process, and
become ready for use. During the power on
process, the Robotics Enabled indicator flashes.
When the library is fully powered on and ready
to receive commands, the Robotics Enabled
indicator turns solid green.
3. If this is a replacement, close the event that was
generated for the failed power supply.
nl
nl
HP web sites
For additional information, see these HP web sites:
http://www.hp.com
http://www.hp.com/go/storage
http://www.hp.com/service_locator
http://www.hp.com/support/manuals
Page 3